« Back

Key Largo Wastewater Treatment District, Vacuum Pump Station
- End Market: W/WW Distribution, Transmission, Collection
- Services Provided:
- Architecture
- Construction Administration
- Landscape Architecture, Urban Design & Planning
- MEP
- Permit Management
- Site Engineering (Civil)
- Surveying & Mapping
- Water Resources Engineering
- Project Size: Basin A consists of 39,031 LF of PVC pipe, and Basin D consists of 33,650 LF of PVC pipe ranging in size from 4-inch to 10-inch. Both VPS’ consist of a 2,600-SF architecturally designed building.
Posted in the categories End Markets, Services.